Examination of Corroded Tubes from the Boilers of the USS EDWARDS (DD-950).
Abstract
Boiler tubes from the USS EDWARDS (DI)-950) have been examined in the laboratory in order to account for a failure after 600-750 hours of steaming. The results of metallographic, x-ray diffraction, and chemical analyses are reported. The probable cause of the rapid attack is suggested.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1959
- Accession Number
- ADA299671
Entities
People
- A. J. Edwards
- A. J. Pollard
- B. F. Brown
- M. C. Bloom
Organizations
- United States Naval Research Laboratory