Preparation of Requirements and Management Plan (RAMP) Packages for Military Construction (MILCON) Program Projects.

Abstract

This ETL provides guidance for the preparation of RAMP packages for executing MILCON projects. A RAMP consists of two documents: a Requirements Document (RD); and a Project Management Plan (PMP). (MM)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 26, 1995
Accession Number
ADA301569

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Army Corps Of Engineers
  • Base Closures
  • Civil Engineering
  • Contracts
  • Cost Estimates
  • Department Of Defense
  • Electronic Mail
  • Engineering
  • Engineers
  • Environment
  • Fire Protection
  • Hazardous Waste
  • Medical Personnel
  • Procurement
  • Project Management

Fields of Study

  • Computer science
  • Engineering

Readers

  • Computer Science.
  • Industrial Economics
  • Software Engineering