Preparation of Requirements and Management Plan (RAMP) Packages for Military Construction (MILCON) Program Projects.
Abstract
This ETL provides guidance for the preparation of RAMP packages for executing MILCON projects. A RAMP consists of two documents: a Requirements Document (RD); and a Project Management Plan (PMP). (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 26, 1995
- Accession Number
- ADA301569