Pentagon New Heating and Refrigeration Plant Staffing and Training Plan.

Abstract

The New Heating and Refrigeration Plant (NHRP) for the Pentagon is expected to be operational in the first quarter of FY96 and replaces the original plant built in 1943. The NHRP utilizes advanced technology including digital control systems. This report identifies the specific staffmg and tralning requirements for operation and maintenance of the new plant as well as identifies transitional issues to be planned for in moving from the operation of the old plant to the new one while assuring 24 hour/day -7 days/week operation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1995
Accession Number
ADA302064

Entities

People

  • John Cable
  • Marguerite Moss

Organizations

  • LMI

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Human Systems

DTIC Thesaurus Topics

  • Air Conditioning
  • Chemistry
  • Computer Programming
  • Computer Programs
  • Computers
  • Control Panels
  • Control Systems
  • Electrical Equipment
  • Employment
  • Engineers
  • Feed Water
  • Maintenance
  • Management Personnel
  • Mechanical Engineering
  • Operating Systems
  • Organizational Structure
  • Personnel Management

Fields of Study

  • Engineering

Readers

  • Electrical Engineering
  • Instructional Design and Training Evaluation.
  • Toxicology/Environmental Toxicology