Contingency Plan, Rocky Mountain Arsenal. Volume 2. Attachment A: Chemical Accident/Incident Response Plan. Attachment B: Installation Spill Contingency Plan.
Abstract
This Contingency Plan (CP) applies to all Army personnel, civilian employees, Army facilities, Army contractors, Army contractor facilities, tenants, and tenant facilities located at the Rocky Mountain Arsenal. The CP is designed to minimize hazards to human health and the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous substances or oil to air, soil, surface water, or ground water, and to provide the procedures for appropriate emergency release notification. The CP is comprised of four volumes. Volume I contains the CP. In Volume I, the most important information has been summeried in a box at the beginning of each section. Subsequent volumes contain attachments to the CP. Volume II contains Attachment A - chemical Accident/Incident Response Plan and Attachment B - Installation Spill Contingency Plan. Volume III contains maps (Appendix J of Attachment B) of the various potential spill sites. Volume IV (in preparation) will contain contractor site-specific contingency plans. The attachments are integral parts of the CP, and provide specific response information based upon the type of incident or the site/facility involved. jg p4
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1990
- Accession Number
- ADA303300