Groundwater Monitoring Report (Annual) for Rocky Mountain Arsenal Commerce City, Colorado. Volume 1.
Abstract
The 1992 Groundwater Monitoring Program (GMP) was established as a one-year transitional program to bridge the gap between the historical Comprehensive Monitoring Program (CMP) and future pre-Record of Decision (ROD) baseline and post-ROD monitoring programs at the Rocky Mountain Arsenal (RMA). Groundwater data collected during the 1992 GMP were obtained to (1) evaluate changes in the extent of contaminant distribution in the Basin F Interim Response Action (IRA) area, (2) monitor the effectiveness of interim remedial actions, and (3) meet regulatory needs.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 03, 1994
- Accession Number
- ADA303445
Entities
People
- Julie Hampel-stephens
- Sara Kohn-rhoades
- Sergius Hanson