Closure Plan for the Basin F Interim Response Action Structures.
Abstract
This document presents the Army's final closure plan for four basin F interim response action structures at RMA. These structures include Pond A, Pond B, the tank farm, and the submerged quench incinerator (SQI). Pond A, Pond B, and the tank farm were constructed to temporarily store liquid from basin F until a treatment and disposal method could be selected. The disposal method was later determined to be incineration in the SQI. Section 2 of this plan presents a general description of the RMA facility and the basin F IRA structures, section 3 presents a detailed discussion of the closure process and associated waste management, section 4 describes the anticipated schedule for closure of the basin F IRA structures, section 5 provides a contingency closure plan, and section 6 provides a list of references used in this document.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1994
- Accession Number
- ADA303447