Chemical Process-Related Activities., Nonagent Process Equipment and Piping Planning Task. Consolidated Implementation Document. Version 3.1.

Abstract

The goal of this Consolidated Implementation Document is to provide an integrated approach to the removal of piping, equipment, tanks, and electrical conduit in the South Plants at the Rocky Mountain Arsenal and to salvage as much of this material as is practicable. The items identified for removal have three characteristics in common: (1) they are associated with the nonagent chemical processes in the South Plants; (2) they have not been previously identified for removal under any other program; and (3) they will only be removed if it is cost effective and safe, therefore minimizing waste. jg p17

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1995
Accession Number
ADA303499

Entities

Organizations

  • Jacobs Engineering Group

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Chemical Warfare
  • Chemical Warfare Agents
  • Chemical Weapons
  • Chemistry
  • Construction
  • Contamination
  • Health Services
  • Hygiene
  • Management Personnel
  • Material Degradation Processes
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Medical Personnel
  • Personnel Management
  • Waste Disposal Facilities
  • Waste Management

Readers

  • Aerospace Engineering
  • Archaeological Resource Survey
  • Environmental Engineering.