Installation of Additional 80 GPM Water Treatment Capacity Pilot Project, Phase 2, Mod 2, New Boston Air Force Station, New Hampshire.
Abstract
This report summarizes activities related to the installation of the second phase of a pilot water treatment system at the New Boston Air Force Station in New Hampshire. This project included the installation, in the Spring of 1995, of an 80 gpm air stripper system to remove radon from a drinking water supply and to reduce the corrosivity of that water. The source consists of bedrock wells with high radon concentration. jg p4
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1995
- Accession Number
- ADA305323
Entities
People
- J. E. Alexant