Electrostatic Measurement Experiment, Scout Vehicle 131-R (S. E. V.).
Abstract
Electrostatic sensors were developed, installed, and flown on Scout Vehicle 131R to experimentally evaluate vehicle electrification due to electrostatic charging. The major charge buildup was found to occur during the burning of the main booster engines. Brief background information followed by a detailed discussion on the experimental results are presented. Further electrostatic studies and experimentation are recommended.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1966
- Accession Number
- ADA306722
Entities
People
- P. E. Greer
Organizations
- Langley Research Center