Basin F Interim Response Action Ground and Surface-Water Monitoring Program Technical Plan. (Operations and Maintenance Manual, Appendix B).
Abstract
This groundwater and surface-water monitoring plan has been prepared by R.L. Stollar and Associates, Inc. (Stollar), and Harding Lawson Associates (HLA) for the Program Manager for Rocky Mountain Arsenal (PMRMA) for groundwater and surface-water monitoring activities at the Basin F Interim Response Action (IRA) area at Rocky Mountain Arsenal (RMA). The plan is a subpart of the PMRMA groundwater and surface-water elements of the Comprehensive Monitoring Program (CMP). p8
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 04, 1992
- Accession Number
- ADA308031