Cost of Processing Reports of Discrepancy: Administrative Costs and Holding Costs.

Abstract

The administrative cost estimates for packaging ROD processing are given for each DLA Supply Center in Table 1. The cost estimates for shipping RODs are provided in Table 2. Each cost incorporates actions performed by DLA activities, service activities, and elements of DoD. For each center, the results have been appropriately averaged over the four possible levels of ROD initiation, based on discrepancy frequency at each level. Costs are separated into accumulated expected costs achieved for non-DLA activities (customers, retail supply points, service maintenance facilities), for DLA Activities (supply centers and DLA depots), and for the Defense Contract Management Command (DCMC) components.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1995
Accession Number
ADA310128

Entities

People

  • John S. Mckinney

Organizations

  • Defense Logistics Agency

Tags

Communities of Interest

  • Engineered Resilient Systems

DTIC Thesaurus Topics

  • Air Force
  • Contractors
  • Contracts
  • Cost Analysis
  • Cost Estimates
  • Databases
  • Department Of Defense
  • Economic Analysis
  • Fringe Benefits
  • Materials
  • Numerical Analysis
  • Probability
  • Probability Distributions
  • Procurement
  • Standards
  • Supply Depots
  • Tank Guns

Readers

  • Logistics and Supply Chain Management.