Weather and Radar Processor (WARP) Operational Capabilities Test (OCT) Procedures.

Abstract

The WARP OCT Procedures identify the test steps which will be used to determine if a vendor's proposed system will meet WARP Stage 0 requirements. The procedures also contain an overview of the OCT test strategy, requirements, conduct, and evaluation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1996
Accession Number
ADA310474

Entities

People

  • Christopher Malitsky
  • Tri Nguyen
  • William E. Benner

Organizations

  • Federal Aviation Administration

Tags

Communities of Interest

  • Space

DTIC Thesaurus Topics

  • Acquisition
  • Airports
  • Computers
  • Data Reduction
  • Databases
  • Dew Point
  • Directories
  • Geographic Regions
  • Governments
  • Grids
  • Hard Copy
  • High Resolution
  • Information Science
  • Intensity
  • Measurement
  • Text Messaging
  • Transportation

Readers

  • Aerospace Test and Evaluation
  • Computer Engineering
  • Technical Research and Report Writing.