Operation REDWING, Pacific Proving Grounds Project 31.2, Release Tone System. May - July 1956.

Abstract

This report describes in detail the operation and components of a frequency shift/frequency modulation system which provides telemetering of bomb release time from an aircraft to a ground station.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 20, 1957
Accession Number
ADA310495

Entities

People

  • Billy M. Ray
  • Robert J. Scussel

Tags

Communities of Interest

  • Air Platforms
  • Energy and Power Technologies
  • Weapons Technologies

DTIC Thesaurus Topics

  • Airborne
  • Aircrafts
  • Amplifiers
  • Control Panels
  • Diagrams
  • Direct Current
  • Electrical Equipment
  • Frequency
  • Frequency Modulation
  • Frequency Shift
  • Ground Stations
  • Modulation
  • Oscillographs
  • Oscilloscopes
  • Transmitters
  • United States
  • Wiring Diagrams

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Explosive Engineering.