Appended Quality Assurance Project Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot.

Abstract

Metcalf & Eddy, Inc. (M&E) under contract to the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAA15-90-0016, Task Order Number 4 has appended the plans prepared for the RFI/CMS base closure at the Lexington-Blue Grass Army Depot, Kentucky. This document is one of these appendices -- the appendix to the Quality Assurance Project Plan. The appended document, Task Order 1, Quality Assurance Project Plan (QAPP), Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) is henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document were incorporated into this appended document unless the comment requested work outside the task order #4 scope of work. Work outside the scope will be conducted at a later date, as deemed necessary by the COR.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 24, 1991
Accession Number
ADA311083

Tags

DTIC Thesaurus Topics

  • Acceptability
  • Chemical Reactions
  • Chemical Synthesis
  • Chemistry
  • Chlorides
  • Computer Programs
  • Databases
  • Environmental Protection
  • Equations
  • Hard Copy
  • Information Science
  • Materials
  • Quality Control
  • Regression Analysis
  • Shipping Containers
  • Standards
  • Training

Readers

  • Environmental Remediation and Restoration.