Heavy Assault Bridge. Cost and Training Effectiveness (CTEA).
Abstract
This initial analysis is to determine the most training and cost effective method of teaching the skills and knowledged required for operation of the Heavy Assault Bridge (HAB) (common name: Wolverine). The analysis was completed as a requirement for Life Cycle System Management Model (LCSMM) Milestone III. The analysis is based on MOS l2F, and a fielding of 106 vehicles. The analysis will be updated as the program develops and additional information is generated.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1995
- Accession Number
- ADA311901
Entities
People
- David K. Carroll Jr
Organizations
- United States Army Engineer School