Alternative Assessment of Interim Response Actions for Other Contamination Sources, M-1 Settling Basins, Version 2.0.

Abstract

This document describes the process and results of the alternatives assessment conducted for the M-1 setting basins. These three basins are located in the south plants area and appear to be a direct source of as contamination to the ground water. (1) Introduction, (2) Site background and results of current and previous investigations, (3) Identification and evaluation of interim action technologies, (4) Development and evaluation of alternatives, (5) Cost estimates. The preferred alternatives are (1) In-situ vitrification and (2) chemical fixation with on-site disposal.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1989
Accession Number
ADA313083

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Aluminum Oxides
  • Chemistry
  • Chlorides
  • Construction
  • Contamination
  • Energy Consumption
  • Environment
  • Environmental Protection
  • Groundwater
  • Hazardous Waste
  • Ion Exchange
  • Material Degradation Processes
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Organic Compounds
  • Organic Materials

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Environmental Engineering.