Draft Final Decision Document for the Interim Response Action for the Improvement of the North Boundary System at Rocky Mountain Arsenal Via Construction of Groundwater Recharge Trenches.

Abstract

THE OBJECTIVE OF THIS INTERIM RESPONSE ACTION IS TO CORRECT A HYDRAULIC IMBALANCE IN THE NORTH BOUNDARY TREATMENT AND RECHARGE SYSTEM. TEN GRAVEL FILLED RECHARGE TRENCHES WILL BE CONSTRUCTED ALONG THE DOWNGRADIENT SIDE OF THE SLURRY WALL. THIS DRAFT FINAL DECISION DOCUMENT PROVIDES SUMMARIES OF: (1) ALTERNATIVES CONSIDERED; (2) SIGNIFICANT EVENTS LEADING TO THE INITIATION OF THE IRA; (3) THE IRA PROJECT; (4) THE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS, STANDARDS, CRITERIA, OR LIMITATIONS (ARAR'S) ASSOCIATED WITH THE PROGRAM. COMMENTS AND RESPONSES ARE FOUND IN THE APPENDIX.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1988
Accession Number
ADA313458

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Pollution
  • Birds
  • Boundaries
  • Chemical Synthesis
  • Chemical Warfare
  • Chlorides
  • Construction
  • Contamination
  • Environmental Monitoring
  • Environmental Pollutants
  • Environmental Protection
  • Groundwater
  • Hazardous Waste
  • Personnel Management
  • United States
  • Waste Disposal Facilities
  • Wildlife

Readers

  • Emergency Management and Homeland Security.
  • Geotechnical Engineering.
  • Systems Analysis and Design