Draft Environmental Impact Statement Reuse of Naval Station Puget Sound, Sand Point, Seattle, Washington. Volume 1.

Abstract

This statement assesses the potential environmental impacts from the reuse of Naval Station Sand Point located in Seattle, Washington. Two reuse plans and a No-action Alternative are evaluated. The reuse plans are the November 1993 Community Preferred Reuse Plan for Sand Point (City Plan) and the June 1993 Muckleshoot Indian Tribe Proposed Reuse Plan for the Naval Station Puget Sound, Sand Point (Muckleshoot Plan). The City Plan (152 acres/61.5 hectares) is the preferred alternative. Land uses proposed in the City Plan include arts, cultural activities, open space/recreation, education, community activities, housing, and institutional applications. Land uses proposed in the Muckleshoot Plan (152 acres/61.5 hectares) include recreation, education, administration, recreational commercial, warehousing, light industrial, and institutional. Under the No-action Alternative, the Navy would continue to be caretaker of the base, but there would be no use of the site. Although both reuse plans have the potential for significant impacts, appropriate mitigation measures by the reuser would reduce the impacts.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1996
Accession Number
ADA317272

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Birds
  • Business Administration
  • Chemical Synthesis
  • Chemistry
  • Employment
  • Fish
  • Habitats
  • Health Services
  • Medical Personnel
  • Personnel Management
  • Recreation
  • Wildlife

Fields of Study

  • Environmental science

Readers

  • Archaeological Resource Survey
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Naval Architecture and Marine Engineering.

Technology Areas

  • Space