Fort Sheridan, Phase II Remedial Investigation/Feasibility Study, Department of Defense Operable Unit, Technical Plan. Addendum.

Abstract

The additional study areas to be investigated under the Fort Sheridan DOD OU RI/Feasibility Study (FS) are described in the following sections. The locations of the study areas are shown in Figure 2-1. The study area descriptions summarize the known history and principal findings at each study area from previous investigations. The primary sources of historical information include the Final Archives Search Report (ACE 1996), aerial photographs, discussions with project personnel, and review of historical maps and data obtained from Fort Sheridan.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 19, 1997
Accession Number
ADA328044

Tags

Communities of Interest

  • Biomedical
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aerial Photographs
  • Ammunition
  • Artillery
  • Base Closures
  • Cameras
  • Chemical Analysis
  • Construction
  • Department Of Defense
  • Drinking Water
  • Environmental Protection
  • Feasibility Studies
  • Organic Compounds
  • Photographs
  • Photography
  • Repair Shops
  • Unexploded Ammunition
  • Volatile Organic Compounds

Readers

  • Environmental Remediation and Restoration.
  • Technical Research and Report Writing.