Installation Restoration Program: Decision Document, UST Site 130, 117th Refueling Wing, Alabama Air National Guard, Birmingham Airport, Birmingham, Alabama
Abstract
The Installation Restoration Program was initiated by the Air National Guard (ANG) to evaluate potential contamination to the environment caused by past practices at its installations. During the 1987 Preliminary Assessment (PA), ten abandoned underground storage tanks (USTs) were identified at nine sites. UST 130 was removed from the area south of Building 130 in January 1991. Remaining soil was above the Alabama Department of Environmental Management's (ADEM) corrective action limit of 100 ppm total petroleum hydrocarbon (TPH), but it is believed to be limited to soils immediately adjacent to the tank pits. The report documents no further action need be taken at this UST site.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1997
- Accession Number
- ADA329068
Entities
Organizations
- Lockheed Martin