Installation Restoration Program. Decision Document, UST Site 175, 117th Refueling Wing, Alabama Air National Guard, Birmingham Airport, Birmingham, Alabama

Abstract

The Installation Restoration Program was initiated by the Air National Guard (ANG) to evaluate potential contamination to the environment caused by past practices at its installations. During the 1987 Preliminary Assessment (PA), ten abandoned underground storage tanks (USTs) were identified at nine sites. During the 1991 Site Investigation, geophysical surveys failed to find a UST at this location (south of Building 175). The report documents no further action need be taken at this the UST site.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1997
Accession Number
ADA329101

Entities

Organizations

  • Lockheed Martin

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Aerial Photography
  • Air Force Facilities
  • Air National Guard
  • Airports
  • Civil Engineering
  • Contamination
  • Department Of Defense
  • Energy Systems
  • Environmental Management
  • Hazardous Waste
  • Installation Restoration
  • National Guard
  • Public Health
  • Refueling
  • Storage Tanks
  • Technical Information Centers
  • Water

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.