MERTS Field Research/Integrated Marine Technology Center-Construction of Buildings and Purchase of Related Equipment.
Abstract
The following steps have been taken to date to complete the purposes of the referenced grant: (1) employment of a qualified architect; (2) completion of facility design; (3) selection of a qualified Contract Manager/General Contractor; (4) contracting for completion of the MERTS Field Research/Integrated Marine Technology Center, with a Guaranteed Maximum Price; (5) purchase of related, selected materials and equipment; (6) progress on construction, including: (a) a completion date of 18 December 97; (b) construction progress report covering the period 21 April 97 to 28 August 97, detailing the status of key construction elements; (c) photographs showing the progress of the construction.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 03, 1997
- Accession Number
- ADA329136