Energy Engineering Analysis Program at New Cumberland Army Depot, PA. Volume 1: Executive Summary.
Abstract
This is the Corrected Final Report on Increments A through G of the Energy Engineering Analysis Program (EEAP) at New Cumberland Army Depot (NCAD). This project has been conducted under the Norfolk District, Corps of Engineers Contract No. DACA 65-8O-C-0O14, by PRC Systems Services, Cocoa Beach, FL. During Increments A and B, four modification projects were recommended for funding under the Energy Conservation Investment Program (ECIP). Increment G resulted in three recommended projects and Increment E determined the feasibility of a new, coal-fired central steam plant. Studies conducted during Increments C, D, and F concluded that none of the proposed work was economically feasible under applicable guidelines. Actual energy consumption at NCAD was determined from electricity billings and from fuel oil delivery records. Costs were taken. from contracts and service agreements that were in force at the times the various increments were undertaken. Using conversion factors specified in the Army Facilities Energy Plan and prices in effect during the year, the following summarizes the total energy picture for fiscal year (FY) 83.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1984
- Accession Number
- ADA330156