FEMP HVAC Upgrade Projects, Fort Riley, Kansas.

Abstract

The proposed construction consists of upgrading the HVAC systems in the dental clinics, Buildings 602, 7665, and 7670. The HVAC system upgrades include the following: Convert the existing dual duct air handling unit (AHU) serving Building 602 to a variable-air-volume (VAV) AHU. A variable speed drive (VSD) will be installed to control the supply fan speed. The existing dual duct mixing boxes will be replaced with dual duct VAV terminal units. The existing ductwork will remain. Convert the existing multizone AHU serving Building 7665 to a VAV AHU. A VSD will be installed to control the supply and return fan speed. VAV terminal units with reheat coils will be installed on the zone supply air ducts. The existing ductwork will remain. Convert the existing dual duct AHU serving Building 7670 to a VAV AHU. A VSD will be installed to control the supply and return fan speed. The existing dual duct mixing boxes will be replaced with dual duct VAV terminal units. The existing ductwork will remain.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1995
Accession Number
ADA330239

Tags

DTIC Thesaurus Topics

  • Army Facilities
  • Contracts
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Electric Power
  • Energy Conservation
  • Energy Consumption
  • Energy Management
  • Feasibility Studies
  • Gas Meters
  • Heat Recovery
  • Life Cycle Costs
  • Life Cycles
  • Natural Gas
  • Public Utilities
  • Two Dimensional

Fields of Study

  • Engineering

Readers

  • Combustion and Flow Dynamics.
  • Energy Conservation and Renewable Energy Engineering.