FEMP HVAC Upgrade Projects, Fort Riley, Kansas.
Abstract
The proposed construction consists of upgrading the HVAC systems in the dental clinics, Buildings 602, 7665, and 7670. The HVAC system upgrades include the following: Convert the existing dual duct air handling unit (AHU) serving Building 602 to a variable-air-volume (VAV) AHU. A variable speed drive (VSD) will be installed to control the supply fan speed. The existing dual duct mixing boxes will be replaced with dual duct VAV terminal units. The existing ductwork will remain. Convert the existing multizone AHU serving Building 7665 to a VAV AHU. A VSD will be installed to control the supply and return fan speed. VAV terminal units with reheat coils will be installed on the zone supply air ducts. The existing ductwork will remain. Convert the existing dual duct AHU serving Building 7670 to a VAV AHU. A VSD will be installed to control the supply and return fan speed. The existing dual duct mixing boxes will be replaced with dual duct VAV terminal units. The existing ductwork will remain.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1995
- Accession Number
- ADA330239