Energy Engineering Analysis, Twin Cities Army Ammunition Plant, New Brighton, Minnesota; Executive Summary

Abstract

This analysis is undertaken to assist the Twin Cities Army Ammunition Plant (TCAAP) in meeting the goals established by the Army Facilities Energy Plan to reduce energy consumption by 20 percent by FY 85. Projects selected for implementation as a result of this analysis will enable TCAAP to achieve the FY 85 goal. These projects have been divided into standby and mobilization status. Total energy savings resulting from standby status project implementation will be approximately 130,800 MBTU's at a total estimated cost of $4.2 million. If mobilization status projects are implemented annual energy savings will be approximately 626,300 MBTU's during periods of full mobilization. The cost of implementing mobilization status projects is estimated at $12.9 million.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1983
Accession Number
ADA330254

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Compressors
  • Ammunition
  • Army Facilities
  • Capital Investments
  • Cooling
  • Energy
  • Energy Conservation
  • Energy Consumption
  • Engineering
  • Executives
  • Fuel Oils
  • Gases
  • Heat Energy
  • Heat Recovery
  • Investments
  • Minnesota
  • Money

Readers

  • Groundwater Contamination Remediation.
  • Life Cycle Cost Analysis
  • Technical Research and Report Writing.