Military Ocean Terminal, Bayonne, New Jersey (MOTBY). Energy Engineering Analysis Program. Volume I: Executive Summary.
Abstract
As a result of the specific requirements of Increments A, B, and G of Contract No. DACA65-81-C-0020, WESTON has performed an extensive energy engineering analysis of various facilities at the Military Ocean Terminal, Bayonne, New Jersey (MOTBY). The analysis has included the following: (1) Site surveys. (2) Examination and inspection of system drawings. (3) Development of mechanical equipment lists. (4) Identification of equipment capacities and building loads. (5) Determination of utility energy consumption quantities and prices. The study has similarly included the development and evaluation, accordingto U.S. Army ECIP criteria, of various energy conservation measures (ECM's). A significant number of preliminary opportunities were considered. Based on extensive review and consideration of total MOTBY operations, a final concensus listing was identified and detailed evaluations performed. This report lists the results of the detailed evaluation of the energy conservation measures and presents them as proposed ECIP projects. In addition, historical basewide energy consumption and the energy savings and energy cost savings based on implementation of the identified projects is include
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1983
- Accession Number
- ADA330256
Entities
Organizations
- Weston Solutions (United States)