Fort Bliss Water Distribution System, Fort Bliss, El Paso, Texas, Energy Engineering Analysis Program (EEAP)
Abstract
The purpose of this study is to analyze the existing system and an alternate method of peak electrical demand shaving for the water distribution system at Fort Bliss, Texas. The existing system will be referred to as Alternative #1 throughout the report. Alternative #2 includes the addition of water storage capacity in order to allow the well and booster pumps to operate only during non-peak electrical periods. This report is prepared in accordance with the scope of work for Contract No. DACA63-93-M-1259, Purchase Request No. FED-MO-0093-0101 (Refer to Appendix M for complete scope of work) and is a continuation of a report conducted in February, 1993 by Carter & Burgess. All pertinent data from the previous report is represented in this report. With the addition of the detailed KY Pipe Analysis. The blast Life Cycle Cost In Design (LCCID) program with the ECIP option was used to determine the Life Cycle Cost (LCC) and Savings to Investment Ratio (SIR) for the analyzed retrofit for a 20 year study life.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1994
- Accession Number
- ADA330354