Fort Bliss Water Distribution System, Fort Bliss, El Paso, Texas, Energy Engineering Analysis Program (EEAP)

Abstract

The purpose of this study is to analyze the existing system and an alternate method of peak electrical demand shaving for the water distribution system at Fort Bliss, Texas. The existing system will be referred to as Alternative #1 throughout the report. Alternative #2 includes the addition of water storage capacity in order to allow the well and booster pumps to operate only during non-peak electrical periods. This report is prepared in accordance with the scope of work for Contract No. DACA63-93-M-1259, Purchase Request No. FED-MO-0093-0101 (Refer to Appendix M for complete scope of work) and is a continuation of a report conducted in February, 1993 by Carter & Burgess. All pertinent data from the previous report is represented in this report. With the addition of the detailed KY Pipe Analysis. The blast Life Cycle Cost In Design (LCCID) program with the ECIP option was used to determine the Life Cycle Cost (LCC) and Savings to Investment Ratio (SIR) for the analyzed retrofit for a 20 year study life.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1994
Accession Number
ADA330354

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Civil Engineering
  • Computers
  • Control Systems
  • Cost Estimates
  • Costs
  • Digital Information
  • Energy Consumption
  • Engineering
  • Gases
  • Groundwater
  • Life Cycle Costs
  • Life Cycles
  • Storage Tanks
  • Systems Engineering
  • Three Dimensional
  • Water
  • Water Supplies

Fields of Study

  • Engineering

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Life Cycle Cost Analysis