Limited Energy Study of Hangar Facilities at Simmons Army Airfield (SAAF), Fort Bragg, North Carolina. Volume 2. Sections 6-10.

Abstract

This section contains the life-cycle cost analyses, energy calculations, and cost estimates for ECO-1: Install High Efficiency Interior/Exterior Lighting Systems. For the buildings in this ECO, multiple options have been calculated when applicable. These options include: (1) Fluorescent fixture replacement; (2) Incandescent lamp replacement; (3) Exit sign replacement; (4) Mercury vapor fixture replacement; (5) Conventional sky light installation with automatic lighting control. A single life-cycle cost analysis and cost estimate was performed for each building which grouped all applicable options together. The following pages contain the analysis for the Airfield buildings. These buildings contained a variety of fixtures. The following table details the replacement fixtures used.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 26, 1995
Accession Number
ADA330370

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Air Cooled
  • Construction
  • Control Panels
  • Cost Analysis
  • Cost Estimates
  • Electricity
  • Energy Conservation
  • Engineering
  • Fuel Oils
  • High Pressure
  • Life Cycle Costs
  • Life Cycles
  • Low Voltage
  • Natural Gas
  • Pipe Fittings
  • Public Utilities
  • Systems Engineering

Fields of Study

  • Engineering

Readers

  • Energy Conservation and Renewable Energy Engineering.