Steam/Power Plant Modernization Program for Indiana Army Ammunition Plant.

Abstract

This study is to develop a cost-effective and technically practical modernization program for the steam/power plants at the Indiana Army Ammunition Plant (INAAP). The recommended modernization approach for the Load, Assemble and Pack (LAP) Area is to construct a new coal-fired central steam plant and distribution system. In the Propellant & Explosives (P&E) Area, modernization of the existing coal-fired facility, Building 401-2, and use of the existing steam distribution system is recommended. Total expenditures required to complete this modernization program are $113 million in FY 1983 dollars. Funding allocations are anticipated for FY 1987 through FY 1993.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 17, 1983
Accession Number
ADA330392

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Ammunition
  • Army
  • Beds (Process Engineering)
  • Contracts
  • Costs
  • Economic Analysis
  • Emerging Technology
  • Energy Consumption
  • Engineering
  • Engineers
  • Executives
  • Gunpowder
  • Heating Plants
  • Life Cycle Costs
  • Life Cycles
  • Management Personnel
  • Transportation

Fields of Study

  • Physics

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Public Financial Management and Budgeting