Basewide Energy Systems Plan, Fort Benning, Georgia. Executive Summary.

Abstract

This is a summary of the results for Increments A, B, C, D, and E of the Basewide Energy Systems Plan for Fort Benning, Georgia (the results for Increments F and G are summarized on pages 5 and 6). The plan includes analyses and recommendations of energy conservation projects for reduction of the installation's present energy consumption. The recommended projects provide partial compliance with the energy conservation requirement for the installation as outlined in the Army Facilities Energy Plan. This summary presents data on the following: * Existing energy consumption * Source energy reductions due to energy conservation techniques for buildings and their systems *Application of solar energy to reduce fossil fuel consumption *Savings utilizing central energy monitoring and control systems (EMCS) * Use of solid waste as an alternate energy source * Analysis of Total Energy/Selective Energy (TE/SE) systems

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1983
Accession Number
ADA330456

Entities

Organizations

  • Black & Veatch

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Army Facilities
  • Control Systems
  • Cost Estimates
  • Energy
  • Energy Conservation
  • Energy Consumption
  • Energy Management
  • Energy Systems
  • Engineering
  • Engineers
  • Fossil Fuels
  • Fuel Consumption
  • Fuel Oils
  • Natural Gas
  • Solar Energy
  • Solid Waste
  • Training

Readers

  • Energy Conservation and Renewable Energy Engineering.