Fort Gordon Boiler/Chiller. Volume I, Narrative Report.
Abstract
This document constitutes the Pre-Final Submittal for Contract DACA2l-84-C-0603, Energy Audits of Boiler/Chiller Plants, Ft. Gordon, Georgia. The purpose of this report is to indicate the work accomplished to date, show samples of field data collected, illustrate the methods and justifications of the approaches taken, outline the present conditions, and make recommendations for the potential energy efficiency improvements to the central heating and cooling plants of Fort Gordon. To date, the initial and detailed field work has been completed; the existing systems in the individual buildings have been reviewed and analyzed; the calculations on various ECO's have been completed and those not eligible for ECIP funding have either been disqualified or placed under the QRIP. Preliminary project documentation has been completed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1991
- Accession Number
- ADA330461