Energy Engineering Analysis Program. Lighting Survey of Selected Buildings, Pine Bluff Arsenal, Pine Bluff, Arkansas. Volume 2A: Appendices
Abstract
The Architect-Engineer shall: (1) perform site survey of specific buildings or areas to collect all data required to evaluate the list of possible ECOs provided in Annex A; (2) Evaluate new ECOs discovered by the AE in his site survey to verify their energy savings potential and economic feasibility; (3) Provide project administrative/technical documentation (DD Form 1391 and Project Development Brochure (PDB)) for qualifying Energy Conservation Investment Program (ECIP) projects as detailed herein. See Annex C for required documentation; (4) Prepare a comprehensive report to document all work (site surveys, evaluations, etc.) performed, the results and all recommendations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1995
- Accession Number
- ADA330492