Energy Survey of Army Boiler and Chiller Plants, Ft. Sill, Oklahoma. Volume 2: Appendices.
Abstract
The Architect-Engineer (AE) shall: (1) Determine the efficiency of the boiler/chiller plants by appropriate tests. (2) Survey the boiler/chiller plants to determine if efficiency can be improved by the repair, addition, or modification of equipment, control systems and operation and maintenance practices and recommend improvements. (3) Identify all energy conservation opportunities (ECOs) including low cost/no cost items and perform complete evaluations of each. And (4) Prepare a comprehensive report to document the work performed, the results and recommendations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1992
- Accession Number
- ADA330604