Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program, Letterkenny Army Depot, Chambersburg, Pennsylvania; Executive Summary.

Abstract

The report consists of an Executive Summary and four volumes. Volume I, the Narrative Report, contains the results of all of the site surveys, analysis and project development. All backup data and calculations are found in Volume II. The site survey notes are in Volume III.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1992
Accession Number
ADA330643

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Compressed Air
  • Conversion
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Economic Analysis
  • Energy
  • Energy Conservation
  • Energy Consumption
  • Engineering
  • Executives
  • Heat Energy
  • Heat Recovery
  • Maintenance
  • Management Personnel
  • Natural Gas
  • Resource Management

Readers

  • Business Analytics
  • Energy Conservation and Renewable Energy Engineering.