A Combined Limited Energy Study of Electrical Energy Demand and Use and Heating Systems at Pine Bluff Arsenal, Arkansas. Volume 4. Programming Documentation
Abstract
The scope of work for this project consist of repairing and/or replacing all of the failed valves, fittings and steam traps on the existing steam distribution piping system served by the boilers in Buildings 32-060, 33-060 and 34-140. The work also includes asbestos abatement which will be required during removal of the existing fitting insulation. New fiberglass insulation will be installed to replace the removed asbestos.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1996
- Accession Number
- ADA330650