A Combined Limited Energy Study of Electrical Energy Demand and Use and Heating Systems at Pine Bluff Arsenal, Arkansas. Volume 4. Programming Documentation

Abstract

The scope of work for this project consist of repairing and/or replacing all of the failed valves, fittings and steam traps on the existing steam distribution piping system served by the boilers in Buildings 32-060, 33-060 and 34-140. The work also includes asbestos abatement which will be required during removal of the existing fitting insulation. New fiberglass insulation will be installed to replace the removed asbestos.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1996
Accession Number
ADA330650

Tags

DTIC Thesaurus Topics

  • Air Compressors
  • Compressed Air
  • Computer Programming
  • Construction
  • Control Systems
  • Cost Analysis
  • Cost Estimates
  • Electric Motors
  • Energy Conservation
  • Energy Consumption
  • Energy Efficiency
  • Energy Management
  • Heat Transmission
  • Materials Laboratories
  • Materials Testing
  • Measurement
  • Steam Traps

Readers

  • Electrical Engineering
  • Environmental Engineering.
  • Internal Combustion Engine (ICE) Technology.

Technology Areas

  • Microelectronics