Energy Engineering Analysis Program. Final Report - Increments A, B, F and G. Volume 1 - Executive Summary. U.S. Army, Rocky Mountain Arsenal.
Abstract
The overall objectives of the EEAP are: (a) Develop a systematic plan of projects that will result in the reduction of installation energy consumption in compliance with the Army Facilities Energy Plan (AFEP). (b) Develop Coordinated Basewide Energy Systems Plans. (c) Prepare Project Development Brochures (PDBs), DD Forms 1391 and supporting documentation for all feasible energy conservation projects.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1983
- Accession Number
- ADA330670