Energy Engineering Analysis Program, Fort Polk, Louisiana. Pre-Final Executive Summary, Increment 'F'

Abstract

Executive Order 12003, dated 19 July 1977, initiated the U.S. Army's energy conservation effort. Specifically, the Executive Order led to the development of the Army Facilities Energy Plan which directs Army Staff and Major Army Commands to develop detailed implementation plans for energy conservation. As a result of these directives, the Fort Worth District of the U.S. Army Corps of Engineers contracted for an Energy Engineering Analysis Program (EEAP) at Fort Polk, Louisiana. The EEAP included Increments 'A', 'B', 'E', and 'O'.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1987
Accession Number
ADA330671

Tags

DTIC Thesaurus Topics

  • Army
  • Army Corps Of Engineers
  • Army Facilities
  • Contracts
  • Diesel Fuels
  • Energy Conservation
  • Energy Consumption
  • Engineering
  • Engineers
  • Executives
  • Fuel Oils
  • Fuels
  • Gases
  • Hot Water
  • Louisiana
  • Management Personnel
  • Materials Laboratories

Readers

  • Defense Acquisition Program Management
  • Environmental Remediation and Restoration.
  • Military Training and Readiness Simulation