AC/ARNG Integrated Division Concept Study, Appendices, Volume 3

Abstract

On May 23, 1996 the Secretary of the Army approved the results of the Army National Guard Division Redesign Study. An integral part of the results called for two AC/ARNG Integrated Divisions. Each AC/ARNG Integrated Division would consist of three ARNG Enhanced Readiness Brigades and an active component (AC) division headquarters. The US Army Training and Doctrine Command (TRADOC) was tasked to conduct a viability assessment of the AC/ARNG Integrated Division concept and focus on merits and implementation issues. Three proposed alternatives were developed to satisfy the intent of the Secretary of the Army: (1) Alternative 1 was an AC AOE division MHC, a division base (decremented to avoid redundancies contained within the brigades), and three assigned ERBs. (2) Alternative 2 was an AC table of distribution and allowances (TDA) HHC and three assigned ERBs. The division HHC does not deploy with the ERBs. (3) Alternative 3 was an AOE division with an AC HHC. The assigned ERBs are reconfigured to task organized AOE designs.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 06, 1997
Accession Number
ADA330761

Entities

People

  • John J. Twohig

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Business Administration
  • Combat Operations
  • Combat Support
  • Command And Control
  • Doctrine
  • Employment
  • Health Services
  • Management Personnel
  • Military Science
  • Operating Systems
  • Organizational Structure
  • Personnel Management
  • Tactical Air Support
  • Three Dimensional
  • Training Management
  • Warfare

Readers

  • Military Mobilization and Reserve Forces Studies.
  • Military Science
  • Software Engineering