Demand Reduction Attachments for Aberdeen Proving Grounds, Aberdeen, Maryland.

Abstract

This group of attachments includes: Electric Rates and Riders; BG&E Substation Requirements; Electric Utility Bills; BG&E 'Billing Interface Data'; Metering Data; Incremental Cost Calculations; Electric Submeter Readings; Natural Gas Bills LCCID Data; LCCID - Energy Escalation Values; Scope of Architect and Engineer Services; Interim Review Comments; Interim Review Responses; Interim Review Meeting Minutes; Telephone Conversation Minutes and Conversations; and Pre-Final Review Comments

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1996
Accession Number
ADA330801

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Construction
  • Cost Analysis
  • Cost Estimates
  • Electric Charge
  • Electric Terminals
  • Electrical Equipment
  • Energy Conservation
  • Engineering
  • Fabrication
  • High Temperature
  • High Voltage
  • Low Voltage
  • Management Personnel
  • Resource Management
  • Switches
  • Transmission Lines
  • Wiring Diagrams

Readers

  • Environmental Remediation and Restoration.
  • Geodesy
  • Government Contracting/Procurement.