Energy Engineering Analysis Program, Redstone Arsenal, Alabama, Energy Survey of Army Boiler and Chiller Plants. Volume 1 - Executive Summary, Part 1 & 2.

Abstract

The Scope of Work specified in contract no. DACAO1-85-C-0131, Parts I and II (and included in this report in Appendix A) requires the performance of a specific energy study. The Energy Conservation Opportunities analyzed under this study will serve as part of Redstone Arsenal's overall effort to reduce basewide energy use in accordance with the objectives set forth in the Army Energy Plan. The contract Scope of Work (sow) for Redstone Arsenal outlines the following specific requirements: Determine the efficiency of the boiler/chiller plants by appropriate tests. Survey the boiler/chiller plants to determine if efficiency can be improved by the repair, addition, or modification of equipment and recommend improvements. Evaluate the control system and recommend changes, repairs, or new controls which will improve the efficiency of the plant. Review operation and maintenance procedures and provide site-specific recommendations which will increase the efficiency of the plants to the maximum level. Prepare a comprehensive report to document the work performed, the results, and recommendations. All of these Scope of Work items have been accomplished.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1987
Accession Number
ADA330804

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Combustion
  • Condenser Tubes
  • Control Systems
  • Cooling Towers
  • Energy
  • Energy Conservation
  • Energy Consumption
  • Engineering
  • Flow
  • Flue Gases
  • Fuel Consumption
  • Gases
  • Heat Energy
  • Heat Exchangers
  • Heat Transfer
  • Water Purification
  • Wet Bulb Temperature

Fields of Study

  • Engineering

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Software Engineering