Energy Audits of Boiler & Chiller Plants, Energy Engineering Analysis Program, Fort Bragg, North Carolina, Volume 1: Narrative Report.

Abstract

This document constitutes the Pre-Final Submittal for Contract DACA21-84-C-0603, Energy Audits of Boiler/Chiller Plants, Ft. Bragg, North Carolina. The purpose of this report is to indicate the work accomplished to date, show samples of field data collected, illustrate the methods and justifications of the approaches taken, outline the present conditions, and make recommendations for the potential energy efficiency improvements to the central energy plants of Fort Bragg. The specific buildings analyzed are: (1) Building C-1432 82nd Heating Plant; (2) Building D-3529 JFK Heating & Cooling Plant, and (3) Building C-6039 82nd Chiller Plant. The following buildings were part of the original scope of work, but were deleted for reasons explained further in Section 1.0 of this report: (1) Building C-7549 Standby Plant for C-1432; (2) Building N-6002 New EM Barracks Complex; and (3) Building H-6240 'H' Area Chiller Plant.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1991
Accession Number
ADA330854

Tags

Communities of Interest

  • Energy and Power Technologies
  • Space

DTIC Thesaurus Topics

  • Business Administration
  • Climate Change
  • Control Systems
  • Cooling
  • Cooling Towers
  • Energy Conservation
  • Energy Consumption
  • Energy Efficiency
  • Flue Gases
  • Fuel Consumption
  • Fuel Oils
  • Gases
  • Heat Energy
  • Heat Loss
  • Heat Recovery
  • Ignition Systems
  • Measurement

Fields of Study

  • Engineering

Readers

  • Business Analytics
  • Electrical Engineering
  • Environmental Remediation and Restoration.