Energy Management Study for General Leonard Wood Army Community Hospital.
Abstract
William Tao & Associates, Inc. (WTA) was commissioned by the United States Army Corps of Engineers (COE) to perform an Energy Management Study of the General Leonard Wood Army Community Hospital (GLWACH). The Hospital is a 366,000 SF facility, with scheduled capacity of 450 patient beds, with a two-story clinical area as a base and a five-story patient tower above. The Hospital was constructed in 1965; in 1978 the patient tower and outpatient clinics were expanded; and in 1981 the Medical Warehouse was completed. The Energy Management Study consists of several phases including but not limited to data collection, data refinement, concept development, energy modeling, developing a utility metering plan and documentation of alternatives and recommendations. This submittal presents finding of the Energy Management Study and provides recommendations for implementation.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 02, 1986
- Accession Number
- ADA330945