Executive Summary, Increment G of BWES, Cameron Station, Alexandria, VA.

Abstract

This report presents the final results of the Increment "G" study of the Basewide Energy Systems Plan for Cameron Station in Alexandria, Virginia prepared by Bernard Johnson Incorporated (BSI) under Contract No. DACA31-81-0-0112. This report also includes results from previous energy studies performed at Cameron Station. The studies are: Increments "A" and "B" of the Basewide Energy Systems Plan, which were performed under the Energy Engineering Analysis Program (EEAP); and those studies performed independent of the EEAP. The combined results from the aforementioned studies indicate that energy use at Cameron Station can be reduced by 22.3 percent in FY85, and 25.8 percent by the Year 2000, as compared to the FY75 energy use baseline.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1981
Accession Number
ADA331047

Tags

DTIC Thesaurus Topics

  • Air Conditioning
  • Air Conditioning Equipment
  • Construction
  • Demolition
  • Electrical Equipment
  • Energy
  • Energy Conservation
  • Energy Consumption
  • Energy Systems
  • Engineering
  • Fuel Oils
  • Fuels
  • Natural Gas
  • Potential Energy

Readers

  • Energy Conservation and Renewable Energy Engineering.