Energy Engineering Analysis Program, Fort Sheridan, Illinois, Basewide Study. Volume I - Executive Summary
Abstract
This analysis was commissioned in April, 1985 by the Corps of Engineers, Louisville District to develop a plan to reduce energy consumption at Fort Sheridan in compliance with the objectives set forth in the Army Facilities Energy Plan (AFEP). By following the plan developed under this study, annual energy cost savings for documented projects will be significantly reduced. The total cost of project implementation is estimated at $4,019,060.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1985
- Accession Number
- ADA331105