Energy Survey of Industrial Facilities (Bldgs. 208, 220 & 222), Rock Island Arsenal, Illinois; Executive Summary.

Abstract

Campbell Design Croup (CDC) has been retained by the Department of the Army, Louisville District, Corps of Engineers to conduct an Energy Study of Industrial Facilities at Rock Island Arsenal, Illinois. Specifically, CDC was contracted to survey Buildings 208, 220 and 222 of the Rock Island complex. This summary will highlight the contents of the Interim Submittal. Certain sections of this report are repeated to allow the narrative for each ECO to stand on its own. It is our opinion that none of the recommended ECOs will have any impact upon mobilization should that occur. Should full mobilization occur during the construction/implementation of any of the ECOs a judgment will need to be made at that time whether to proceed or to back-off. We do, of course, strongly recommend that no construction/implementation of any ECO be started until all material parts and labor are on hand to quickly and efficiently complete the work.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1989
Accession Number
ADA331381

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Control Systems
  • Cost Analysis
  • Cost Estimates
  • Costs
  • Economic Analysis
  • Economics
  • Energy
  • Energy Conservation
  • Energy Consumption
  • Engineering
  • Engineers
  • Heat Energy
  • Heat Recovery
  • Hydraulic Accumulators
  • Investments
  • Money
  • Natural Gas

Readers

  • Business Analytics
  • Educational Psychology
  • Energy Conservation and Renewable Energy Engineering.