Revised Final Remedial Investigation. Addendum Report for Operable Units 4, 8, and 9. Volume I

Abstract

This revised final report presents the results of previous investigations as well as the results of the Phase I and Phase II RI sampling and analysis for 11 SWMUs within three operable units at Tooele Army Depot (TEAD). TEAD is a National Priorities List (NPL) site under CERCLA. This requires that a Remedial lnvestigation/Feasibility Study (Rl/FS) must be performed. The Phase I and Phase II RI was designed to (1) fill data gaps identified from previous investigations, (2) determine the nature and extent of contamination, and (3) estimate risks to human health. The estimates of risk to the environment were assessed in a separate document, the TE4D Site-wide Ecological Risk Assessment Report. This report presents the results of the RI studies in four volumes. Volume I is the RI Addendum Report and Volumes 11,111, and IV are appendices of supporting information.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1997
Accession Number
ADA332617

Entities

People

  • J. Hampel-stephens
  • J. Ludlam
  • Kerry Davis‐Amendola
  • Lawrence T. Clark
  • P. Seig

Tags

Communities of Interest

  • Biomedical
  • Weapons Technologies

DTIC Thesaurus Topics

  • Alkenes
  • Chemical Synthesis
  • Chemistry
  • Environment
  • Environmental Protection
  • Groundwater
  • Health Services
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Medical Personnel
  • Munitions Testing
  • Organic Chemistry

Readers

  • Environmental Remediation and Restoration.