Roughans Point Coastal Flood Damage Reduction Project, Revere, Massachusetts; Design Memorandum No. 2 Hydrology and Hydraulics

Abstract

This memorandum presents the hydrologic and hydraulic criteria and analysis pertinent to the design of coastal flood damage reduction improvements for Roughans Point in Revere, Massachusetts. Included are the results of physical and mathematical model investigations and analysis, descriptions of the hydraulic features, and hydrologic effects of the proposed project. This memorandum which includes the results of model studies completed in 1986 is intended to serve as an update to earlier hydrologic and hydraulic studies conducted during the feasibility investigation which was completed in 1983. Geotechnical and civil design studies needed for the General Design Memorandum (GDM) have been ongoing since completion of model studies. This memorandum, a companion document to the GDM, is being submitted for HQUSACE review on a concurrent basis.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1991
Accession Number
ADA336614

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Cyber
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Civil Engineering
  • Climate Change
  • Coastal Engineering
  • Coastal Flooding
  • Flood Control
  • Meteorology
  • Sea Level
  • Sea Level Rise
  • Storm Surges
  • Tidal Flooding
  • Two Dimensional
  • Water Resources
  • Wave Propagation

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering