Minutes of the 41st Computer Resources Integration Management Meeting

Abstract

The 41st CRIM was held 14 May 1991 at 1300 hours in Room 1C1600 at USASDC in Huntsville, Alabama. The theme for this CRIM was the second of three meetings devoted to Parallel Processing (PP). Presenters were from both the government and the private sector, and they provided topic discussions on current research and development projects using parallel processing. The meeting began with Mr. Frank Poslajko presenting the agenda. Next, Mr. Poslajko presented a slide concerning the various committee and working group meetings in the near future. During the presentation of the forthcoming meetings, SEI Contractor Software Capabilities Workshop was discussed and Dr. Ron Green commented that contractors will be required to demonstrate a Level 2 on the SEI rating scale and prepare a plan for transitioning to Level 3. In addition, a slide was presented on the different topics of parallel processing (i.e., PP computers, software and tools, compilers, etc.). This slide established a high level breakdown of the various PP suboomponents. Finally, Mr. Poslajko presented a status report on the USASDC Ada Workshop which began March25.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 14, 1991
Accession Number
ADA337854

Entities

Organizations

  • Teledyne Technologies

Tags

Communities of Interest

  • Advanced Electronics
  • C4I
  • Space

DTIC Thesaurus Topics

  • Command And Control
  • Computer Programming
  • Computers
  • Contractors
  • Data Reduction
  • Networks
  • Operating Systems
  • Parallel Computing
  • Parallel Processing
  • Reliability
  • Resource Management
  • Simulations
  • Simulators
  • Software Design
  • Software Development
  • Storage
  • Test Facilities

Readers

  • Academic Conference Management
  • Defense Acquisition Program Management
  • Integrated Circuit Design and Technology.