Task-5 Heat Pipe Life Test Study; Facilities Upgrading and Maintenance.

Abstract

This report describes the recommissioning, upgrading, and maintaining of thirty low and five high temperature heat pipe life test rigs. This is an ongoing research effort, originally put together by NASA LeRC, continued by the Air Force. The 92 c long 1.27 cm dia. spacecraft-type heat pipes have completed nearly 74,000 hours of life tests. They exhibit varying ATs across the length and symptoms of gas accumulation. Life test status and temperature profile for each pipe are presented. The sodium and potassium pipes have undergone relatively less hours of testing (34,000 hours) only. These five pipes are exhibiting normal status, All the life tests will continue till failure and there will be updates of this report.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1991
Accession Number
ADA338863

Entities

People

  • Rengasamy Ponnappan

Organizations

  • Universal Energy Systems

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Alcohols
  • Classification
  • Cooling
  • Data Acquisition
  • Energy
  • Energy Storage
  • Fluids
  • Heat Transfer
  • Manufacturing
  • Measurement
  • Procurement
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Vacuum
  • Vacuum Chambers

Readers

  • Combustion and Flow Dynamics.
  • Mathematics or Statistics
  • Software Engineering

Technology Areas

  • Space
  • Space - Hall-Effect Thruster