The Department of Defense has released details on major defense acquisition program cost and schedule changes since the September 1997 reporting period. This information is based on the Selected Acquisition Reports (SARs) submitted to the Congress for the December 31, 1997 reporting period. SARs summarize the latest estimates of cost, schedule, and technical status. These reports are prepared annually in conjunction with the President's budget. Subsequent quarterly exception reports are required only for those programs experiencing unit cost increases of at least 15 percent or schedule delays of at least six months. Quarterly SARs are also submitted for initial reports, final reports, and for programs that are rebaselined at major milestone decisions. The total program cost estimates provided in the SARs include research and development, procurement, military construction, and acquisition related operation & maintenance. Total program costs reflect actual costs to date as well as anticipated costs for future efforts. All estimates include allowances for anticipated inflation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 03, 1998
Accession Number
ADA342084

Entities

Organizations

  • United States Department of Defense

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Aircrafts
  • Anti-Tank Missiles
  • Artificial Satellites
  • Cooperative Engagement Capability
  • Cost Estimates
  • Department Of Defense
  • Engineering
  • Intercontinental Ballistic Missiles
  • Multiple Launch Rocket System
  • Navy
  • Procurement
  • Radar
  • Systems Engineering
  • Test And Evaluation
  • Warning Systems

Readers

  • Life Cycle Cost Analysis
  • Technical Research and Report Writing.